Sealand Aviation Blog

Big pipes and baby blues

The wiring is daunting, the exhaust pipe looks humongous and the cowls fit perfectly: the install continues.

Rick Valdez is installing the wiring harness. wiring

The engine looks well organized and accessible, as Derek continues with the installation.Derek and engine

The cowls are being fitted by Jack Barbee.cowls

The exhaust pipe is impressive.pipe

The pipe doesn't look so big with the cowling on.cowl

Derek and Tom install the prop.prop

The next step is to run it up.  For that, we have to wait for Bobby Bishop of Texas Turbines, who will come check it out and be the first to put the power to it.

 

⇦ Back